|
TRAINMASTER
BY WERNER MEER US-RAILROAD-SHOP KILCHBERG |
|
updated / added: May 17, 2015, updated November 28, 2015 (new films 3, 4. 5)
for bigger size photos click on the 3-digit number below each photo / für grössere Bilder auf die 3-stellige Nummer klicken
Fakten (techn. Daten) / Figures and Facts |
|
Baubeginn: 2007, Abbruch Sept 2015 |
Construction started in 2007, out of service Sept 2015 |
Grösse: 480 x 360 cm auf 2 Etagen, verbunden durch Lift | Size: 16 x 12 feet on 2 levels connected by elevator |
Unterbau: L-Träger / MDF, Sperrholz und Styropor | Underframe: L-Girder / MDF, Plywood and Styrofoam |
Gelände: Styroporspanten, Alu-Gitter, Gipsbinden, Spachtel |
Landscaping: Styroframes, Aluminum-Mesh, Plaster
Cloth Plaster Filler |
Geleise: Peco Schmalspur 16,5 mm | Track: Peco Narrow Gauge 16,5 mm |
Weichen: Peco / von Hand gestellt | Switches: Peco / hand thrown |
Steuerung: Digital / Selectrix (nur Fahren) | Electrical: Digital / Selectrix (just for running the models) |
Fahrzeuge: Bachmann/Spectrum, Loks und Wagen | Rolling Stock: Bachmann Spectrum, Locos and Cars |
Gebäude: Selbstbau und Bausätze | Structures: some scratchbuilt, some kits |
scroll down to see all photos / bitte nach unter scrollen um alle Fotos zu sehen
von der Turtle Creek Central Anlage gibt es 5 Kurzfilme / there are 5 short movies about this layout |
Film 1 - 2013 (9'29"): https://www.youtube.com/watch?feature=player_detailpage&v=fIpALRs20-Q |
Film 2 - 2014 (8'49"): https://www.youtube.com/watch?feature=player_detailpage&v=19Iq2tN7guY |
Film 3 - 5/2015 (4'01"): https://www.youtube.com/watch?v=a7w_K2c6cio |
Film 4 - Cab Ride 2015 (4'26"): https://www.youtube.com/watch?feature=player_detailpage&v=no5PkEs3FkM |
Film 5 - Last Train 8/2015 (5'36"): https://www.youtube.com/watch?v=dZsUyZYJ1Lc&feature=player_detailpage |
001 | 002 |
003 | 007 |
006 | 008 |
004 | 005 |
651 | 654 |
658 | 680 |
676 | 675 |
677 | 678 |
682 | 683 |
695 | 699 |
773 | 788 |
805 | 808 |
810 | 833 |
836 | 839 |
848 | 851 |
854 | 860 |
863 | 867 |
872 | 876 |
890 | 879 |
883 | 885 |
891 | 894 |
905 | 908 |
916 | 922 |
930 | 932 |
938 | 943 |
947 | 956 |
Dieser Lift verbindet die beiden Ebenen / this Elevator is connecting both levels |
|
Der Zug fährt in den Lift
(Halbkreis), dann fährt der Lift vertikal zur anderen Ebene und der Zug
kann wieder ausfahren. |
|
The train is rolling into
the elevator (half circle), afterwards the elevator is moving vertical to
the other level and the train can exit. |
|
copyright by Paul Dell Ava - 2015
Back to American Layouts Main Page: click here